aimestimating.co

CPM Scheduling Services

At AIM Estimating, we provide highly accurate and reliable Critical Path Method (CPM) Scheduling Services for contractors, builders, developers, and project managers across the United States and the United Kingdom. Our goal is to ensure your construction project stays on time, within budget, and fully optimized for maximum efficiency with minimum risk.

Our CPM scheduling methodology breaks down the project into essential activities, analyzes their durations, identifies high-risk elements, and shows how each task connects within the overall construction timeline. This allows you to clearly see the most profitable, time-saving, and cost-efficient path to completion.

A correctly structured CPM Schedule not only helps you anticipate issues before they occur, but also gives you a powerful project management roadmap to track progress, quantify results, and maintain workflow accuracy throughout the project lifecycle.

CPM Scheduling Consultants – AIM Estimating

Our expert CPM scheduling consultants actively coordinate with your project team during every phase of the construction process—from early design to construction and close-out. We ensure your milestones are realistic, achievable, and aligned with contractual requirements, budget limits, and industry standards.

We collaborate closely with:

  • General Contractors

  • Subcontractors

  • Architects

  • Owners

  • Project Managers

Our priority is to keep your project on schedule, avoid costly delays, and provide strategic planning to maintain smooth workflow at every stage.

Why Choose AIM Estimating for CPM Scheduling?

Proven success delivering schedules on time and within budget
Fastest turnaround time in the USA & UK
Expert use of industry-leading software
Cost-effective, accurate scheduling solutions
Full project lifecycle support
Risk analysis, delay recovery & claims preparation

CPM Scheduling Software We Use

Our team is fully proficient in:

  • Microsoft Project

  • Primavera P6

  • SureTrack

  • FastTrack

  • Oracle Scheduling Tools

Our CPM Scheduling Services Include

  • Baseline CPM Scheduling

  • Schedule Updating

  • CPM Analysis

  • Construction Phase Scheduling

  • Preliminary Scheduling

  • Recovery Scheduling

  • As-Built Scheduling

  • Linear Scheduling

  • Window Analysis

  • Time Impact Analysis

  • Procurement Scheduling

  • Civil & Infrastructure Scheduling

  • Construction Management Scheduling

  • Legal Claims Consulting

Our Deliverables Include

  • Preliminary & Initial Schedule

  • Monthly/Periodic Updates

  • Narrative Reports

  • Critical Path Reports

  • Float Analysis

  • Earnings & S-Curve Analysis

  • Delay & Risk Analysis

  • Network Diagrams

  • Complete Schedule Data Files (SDEF included)

Industries We Serve

We provide CPM scheduling for:

  • Residential

  • Commercial

  • Industrial

  • Healthcare

  • Civil Projects

  • Infrastructure

  • Public Sector

  • Historic Buildings

Frequently Asked Questions

How long does it take to receive the project schedule?

We typically deliver a complete schedule within 5–7 days, depending on project size.

What do you include in the schedule package?

All reports, diagrams, narratives, progress tracking, risk analysis, and SDEF files are included.

How much do you charge?

We offer highly competitive pricing for UK & USA clients.
📞 UK: 07403 804117
📞 USA: +1 406 316 0085

If you’re looking for reliable construction estimating services, we’re here to help!
Call us at +1 (406) 316-0085 (USA) or +44 7403 804117 (UK)
Or upload your plans using the link below to receive a detailed quote within 5 minutes.

Our Services

AIM ESTIMATING

USA:  +1 (406) 316-0085
UK:  +44 7403 804117
info@aimestimating.co

Scroll to Top